The construction of the gold-concentrating area begins with the construction of a ramp on the basis of a retaining wall. Road for the arrival of front-end loader or dump truck for unloading in the receiving hopper is constructed too. The building of the gold-concentrating area is built on the basis of a metal container with wooden extensions, which depending on the location of washing devices can be transported from one place to another. It is installed closed to ramp for the subsequent construction of the equipment line consisting of a receiving hopper, conveyor, jigging machines and concentration tables. Place for construction of the gold-concentrating area is selected according to availability of water entry.

The gold-concentrating area is intended for processing of sluice concentrates and concentrate with other kinds of washing devices. The technology is aimed to additional extraction of rough gold and gold-containing products.

We are glad to answer all your questions.

Olga Goncharova
Head of sales department
tel. 8-923-333-10-48
e-mail: goncharova.o@goldmine.gold

Back